This was a high profile central government service with large amounts of money at stake, a lot of unknowns, and an MVP that could not rely on permissions or unique role types.
01
Three Types of Users, One Simple Tool
02
Sparse Knowledge of the Process
03
Ambition Versus What the Data Could Support

Contribution

01
Research and hypotheses to guide design
Very little was documented, so the work began by writing down what was known with subject matter experts, then turning gaps and assumptions into hypotheses for research and design to test. The result was a shared set of hypotheses to design against, instead of starting from a solution.

02
Ideation from dashboards and wireframes
Early ideas drew on existing dashboards and quick wireframes, making it easy to explore ways of showing workload, deadlines and project detail before settling on one, and giving assessors and policy designers a wider set of options to react to.

03
Testing with lead assessors
Designs were tested with lead assessors, assessors and policy designers at DLUHC. Sessions showed that knowing how many applications were left against a deadline helped, that funding requested signalled complexity and profile, and that search was needed to find projects, shaping a design around how lead assessors prioritise.

04
Prototyping in code and handover
The prototype was built in code to GOV.UK and GDS standards, prioritised with engineering and handed over with prototype guides others could pick up, while a junior designer was coached through the work. The result was a prototype close to what would be built, with guidance accessible beyond the original designer.
Surge assessor
Interaction design
Research
Prototyping in code
Co-design
Psychology and change
Assessors were making high-stakes funding decisions with very little tooling, so the new tool had to feel simple, familiar and worth switching to straight away.
Psychology
One simple tool for everyone
Lead assessors, assessors and policy teams all used the same low-complexity tool, so nobody had to learn role-specific screens or permissions.
Psychology
Progress at a glance
Showing how many applications were left against a deadline helped assessors see their progress and pace their work, which kept momentum up.
Psychology
Familiar from day one
Built with GOV.UK patterns and components, the tool looked and behaved like services assessors already knew, so switching to it felt low risk.
Change
Co-designing with assessors
The tool was co-designed with assessors and funding teams, so it was shaped around how they really allocate work and felt like their own.
Change
Quick wins
Simple changes like search and workload counts made daily work easier straight away. One assessor said they were crying with joy because it was easier.
Change
Seeing feedback make a difference
Regular testing with lead assessors meant they saw their feedback turn into changes, which built confidence in the tool before it launched.

